Industry
Light manufacturing
BOM, shop floor, and books that agree — make-to-order included.
Make-to-order or make-to-stock without a factory spreadsheet that finance never trusts.
Where it breaks: Sales promised a date the floor never saw. Finished goods cost is a guess until someone rebuilds it in Excel.
How it runs on BoltERP: Sales confirm → MO (from order or plan) → reserve components → shop-floor output → FG into stock with cost → invoice.
Smart features
How BoltERP’s connected apps work for Light manufacturing
MO spawned from sales
A confirmed order can create the manufacturing order automatically — the promise date on the quote is the date production sees.
Shortage → buy signal
Missing BOM components raise purchase proposals or RFQs before the store discovers the gap at 4pm.
Work-centre load view
See which bay is booked so two jobs do not claim the same capacity on the same day.
Finished goods costing
Material, labour, and overhead roll into inventory at completion — Accounts does not invent a standard cost later.
Supplier scorecards
SRM ranks vendors on delivery and quality so raw-material buys are evidence, not whoever emailed last.
One suite for Light manufacturing
Every app shares the same masters.
Toggle to see what Light manufacturing operators usually pay for beside Excel.